ADVERTISEMENT

Bandra-Worli Sea Link

The Bandra cable-stay section of the Bandra Worli Sea Link spans 600m in length and towers to a height of 126m (as high as a 43-story building). The cable stay system comprises of 2250km high strength galvanised steel wires which support the cable stay bridge weighing 20,000 tons.
The Bandra cable-stay section of the Bandra Worli Sea Link spans 600m in length and towers to a height of 126m (as high as a 43-story building). The cable stay system comprises of 2250km high strength galvanised steel wires which support the cable stay bridge weighing 20,000 tons.
The launching gantry lifts and aligns the last sections for the completion of the bridge. The bridge is built using pre-cast concrete segments, each weighing up to 140 tons.
The launching gantry lifts and aligns the last sections for the completion of the bridge. The bridge is built using pre-cast concrete segments, each weighing up to 140 tons.
The bridge foundation comprises of large dia piles arising from 15m below the sea level.
The bridge foundation comprises of large dia piles arising from 15m below the sea level.
Inauguration Ceremony
Inauguration Ceremony
Inauguration Ceremony
Inauguration Ceremony
Scenes from the Inauguration ceremony.
© Copyright 2012 NetIndian. All rights reserved. Republication or redistribution of NetIndian content, including by framing or similar means, is expressly prohibited without the prior written consent of NetIndian Media Corporation. Write to info[AT]netindian[DOT]in for permission to use content. Read detailed Terms of Use.